Capital subsidy in the project report

Updated . Reviewed by Rishabh Goyal, Chartered Accountant. Every paid answer is checked by a CA. Free AI answers are labelled until a CA verifies them.

Facts

Subsidies received after commencement cannot fund the initial project cost. Banks usually treat back-ended subsidies separately, sometimes as a later reduction of the loan.

Provisions and law

Prime Minister's Employment Generation Programme (PMEGP), Ministry of MSME through KVIC; Para 4.4(4) and 4.7, RBI Master Direction Lending to MSME Sector

Analysis

Show the full project cost funded by your contribution and the bank loan, and note the expected subsidy and its timing. When received, the bank may adjust it against the term loan or keep it as a deposit for a period, depending on the scheme. For example, a Rs 1 crore project with Rs 15 lakh back-ended subsidy still needs the full Rs 1 crore at start. Check whether your scheme requires the subsidy to be kept with the bank.

Conclusion

  1. Show full cost and funding without the subsidy
  2. Note the expected subsidy and timing
  3. Read the scheme's rules on how it is credited
  4. Plan cash for the gap until receipt

Counting a future subsidy as current funding leaves a hole in your project.

Connect now

A Savvy replies in minutes.

Fixed price before you pay. Your Savvy is paid only after you accept the work.

General guidance from TaxSavvy’s library of money processes. Laws change; your Savvy confirms the answer on your exact case before anything is filed.